IS WORK OVER?

Automation index

How much of a Pesticide applicator’s job can AI already do?

A farm log comes earlier. Treating without taking the neighbour or the river do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Pesticide applicator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Log, product and the dose.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Apply, drift and the wind that gets up.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
The withholding period and the one who wants in now.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
PPE, the container and the collection point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The neighbour, the bees and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not taking the river, and signing the treatment.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm log
  • pesticide dose
  • drift
  • withholding period
  • PPE
  • empty containers
  • bees
  • field wind

Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113

Corrosion engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Thicknesses, the map and the coupon.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the pipe and the one that is thin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cathode, the protection and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shutdown, the coating and not painting over rust.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the rush and not leaving the thin one in service.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop before it goes, and not painting over it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thicknesses
  • corrosion maps
  • cathodic protection
  • coatings
  • thin pipes
  • shutdowns
  • rust
  • coupons

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 353Aquaculturist22%
  2. 354Insulation installer22%
  3. 355Adult literacy tutor22%
  4. 357Archaeologist22%
  5. 358Building surveyor22%
  6. 359Foley artist22%