Automation index
How much of a Pesticide applicator’s job can AI already do?
A farm log comes earlier. Treating without taking the neighbour or the river do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pesticide applicator
22%
AI can already do 22% of this job.
#319 / 633
View rankingPesticide applicator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Log, product and the dose.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Apply, drift and the wind that gets up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The withholding period and the one who wants in now.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
PPE, the container and the collection point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The neighbour, the bees and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not taking the river, and signing the treatment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm log
- pesticide dose
- drift
- withholding period
- PPE
- empty containers
- bees
- field wind
Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113
IS WORK OVER?
Metro driver
19%
#486 / 633
View rankingMetro driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Checks, tests and the cab log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, stop at platforms and regulate running.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Incidents, evacuation and talk to Control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Timetables, reliefs and the day’s orders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Passengers, platforms and announcements.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Rules, fatigue and liability for the train.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive metro trains
- stop at platforms
- regulate running
- evacuate tunnels
- talk to control
- cab checks
- handle incidents
- drive under ATO
Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311