Automation index
How much of a Pesticide applicator’s job can AI already do?
A farm log comes earlier. Treating without taking the neighbour or the river do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pesticide applicator
22%
AI can already do 22% of this job.
#319 / 633
View rankingPesticide applicator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Log, product and the dose.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Apply, drift and the wind that gets up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The withholding period and the one who wants in now.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
PPE, the container and the collection point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The neighbour, the bees and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not taking the river, and signing the treatment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm log
- pesticide dose
- drift
- withholding period
- PPE
- empty containers
- bees
- field wind
Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113
IS WORK OVER?
Quality engineer
29%
#63 / 633
View rankingQuality engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
FMEA, control plan and the limits.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
8D, claims and the supplier.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Audit, IATF and the awkward finding.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The line, the defect and stop or not.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
APQP, PPAP and the customer launch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Release with judgement, and not hiding the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- FMEA
- 8D
- control plan
- IATF
- PPAP
- APQP
- supplier claims
- release batches
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141