Automation index
How much of a Pesticide applicator’s job can AI already do?
A farm log comes earlier. Treating without taking the neighbour or the river do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pesticide applicator
22%
AI can already do 22% of this job.
#319 / 633
View rankingPesticide applicator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Log, product and the dose.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Apply, drift and the wind that gets up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
The withholding period and the one who wants in now.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
PPE, the container and the collection point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The neighbour, the bees and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not taking the river, and signing the treatment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm log
- pesticide dose
- drift
- withholding period
- PPE
- empty containers
- bees
- field wind
Sources for this job· O*NET 37-3012.00· ESCO/ISCO 6113
IS WORK OVER?
Wastewater-plant operator
19%
#519 / 633
View rankingWastewater-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, process and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Basin, the sludge and the one that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Breakdown, the pump and at night.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Test, the discharge and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the overflow and not opening extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come out clean, and the sludge in place.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- works flow
- sludge
- basins
- pumps
- discharges
- overflows
- plant logs
- final tests
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132