Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#248 / 693
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Adult literacy tutor
22%
#335 / 693
View rankingAdult literacy tutor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Level, the sheet and the one who did not come.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Reading, the contract and the small print.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Writing, the form and not doing it for them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Group, the shame and not exposing them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the grant and not inflating attendance.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they read the contract, and not being ashamed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- syllables
- reading contracts
- forms
- literacy groups
- shame
- small print
- attendance
- not expose
Sources for this job· O*NET 25-3011.00· ESCO/ISCO 2359