IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Army officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Order, the map and the section.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the one who lags and the one who jumps.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Live fire, safety and not playing brave.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Logistics, the meal and the one that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Command, the pressure and not dressing casualties.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Get them all out, and not losing one.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • operations orders
  • sections
  • the map
  • live fire
  • meals
  • casualties
  • command
  • field safety

Sources for this job· O*NET 55-1015.00· ESCO/ISCO 0110

Analyse my job

Jobs with similar scores

  1. 256Environmental engineer25%
  2. 257Biomedical engineer25%
  3. 258Civil engineer25%
  4. 260Production engineer25%
  5. 261Robotics engineer25%
  6. 262Telecom engineer25%