Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 633
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Bus driver
15%
#620 / 633
View rankingBus driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run sheet, logs and clocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive the route or the charter.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Stops, accessibility and fare or validation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 10% | +1.8 |
Incidents, diversions and passenger care.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pre-trip check and defect reports.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Shifts, fatigue and driving rules.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive
- route
- load goods
- Run sheet, logs and clocking
- Drive the route or the charter
- Incidents, diversions and passenger care
- Pre-trip check and defect reports
- Shifts, fatigue and driving rules
- conductor de autobus
- bus driver
Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331