IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Control engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PID, tune and the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the swing and the one that runs away.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Mode, manual and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Alarm, the interlock and not silencing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the recipe and not changing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not swing, and not leaving manual for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • PID
  • tune
  • swings
  • manual mode
  • interlocks
  • recipes
  • control models
  • not silence alarms

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 265Environmental engineer25%
  2. 266Biomedical engineer25%
  3. 267Civil engineer25%
  4. 269Production engineer25%
  5. 270Robotics engineer25%
  6. 271Telecom engineer25%