Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 623
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Diving instructor
19%
#498 / 623
View rankingDiving instructor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Briefing, tables and the plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Water, the student and the one who panics.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Drills, the regulator and the one who is out of air.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Log, certification and not giving the star away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The current, the vis and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come up whole, and not skipping the stop.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- dive briefing
- tables
- regulator
- certify divers
- current
- visibility
- stops
- nervous students
Sources for this job· O*NET 25-3021.00· ESCO/ISCO 3422