IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Economist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Clean data, estimate and produce tables.
Estimate

No public source provides a precise figure. This is our estimate.

22%52%+11.4
Draft notes, briefs and a first paper.
Estimate

No public source provides a precise figure. This is our estimate.

18%45%+8.1
Choose model, assumptions and robustness.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Present to a client, ministry or board.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Debate, peer-review and defend the numbers.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Read the political context and data quality.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Total100%30%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Clean data, estimate and produce tables
  • Draft notes, briefs and a first paper
  • Choose model, assumptions and robustness
  • Present to a client, ministry or board
  • Debate, peer-review and defend the numbers
  • economista
  • economist

Sources for this job· O*NET 19-3011.00· ESCO/ISCO 2631

Analyse my job

Jobs with similar scores

  1. 229Environmental engineer25%
  2. 230Biomedical engineer25%
  3. 231Civil engineer25%
  4. 233Production engineer25%
  5. 234Robotics engineer25%
  6. 235Telecom engineer25%