Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 623
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Environmental engineer
25%
#229 / 623
View rankingEnvironmental engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model emissions, discharges and noise.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Impact studies, permits and specs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Field, sampling and treatment plants.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Authorities, public and objections.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Rules, reports and monitoring.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not dressing an environmental figure.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Model emissions, discharges and noise
- Impact studies, permits and specs
- Field, sampling and treatment plants
- Authorities, public and objections
- Rules, reports and monitoring
- Not dressing an environmental figure
- ingeniero ambiental
- environmental engineer
Sources for this job· O*NET 17-2081.00· ESCO/ISCO 2143