IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Executive chef

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Menus, dish sheets and food cost.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Orders, suppliers and waste.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Pass, plating and service pace.
Estimate

No public source provides a precise figure. This is our estimate.

20%10%+2
Lead the brigade, shifts and conflicts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Cook on the line and correct doneness.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Hygiene, audits and the house’s name.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • cook
  • mise en place
  • dishes
  • bake
  • Menus, dish sheets and food cost
  • Orders, suppliers and waste
  • Pass, plating and service pace
  • Lead the brigade, shifts and conflicts
  • Cook on the line and correct doneness
  • Hygiene, audits and the house’s name

Sources for this job· O*NET 35-1011.00· ESCO/ISCO 3434

Analyse my job

Jobs with similar scores

  1. 229Environmental engineer25%
  2. 230Biomedical engineer25%
  3. 231Civil engineer25%
  4. 233Production engineer25%
  5. 234Robotics engineer25%
  6. 235Telecom engineer25%