IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Fire investigator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Scene, the origin and not treading it.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cause, the short and the rag.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Sample, the lab and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Report, the insurer and not selling it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The judge, the hearing and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Call the cause, and not selling it to the insurer.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fire origin
  • shorts
  • rags
  • samples
  • expert reports
  • insurers
  • the scene
  • not tread

Sources for this job· O*NET 33-2021.00· ESCO/ISCO 3119

Analyse my job

Jobs with similar scores

  1. 260Environmental engineer25%
  2. 261Biomedical engineer25%
  3. 262Civil engineer25%
  4. 264Production engineer25%
  5. 265Robotics engineer25%
  6. 266Telecom engineer25%