Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#278 / 763
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Firmware engineer
22%
#399 / 763
View rankingFirmware engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Image, the signature and the slot.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Flash, the batch and the one that bricks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Rollback, the test and not skipping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Boot, the brick and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The factory, the cadence and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Flash without bricking, and not skipping rollback.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- firmware images
- digital signature
- slots
- flash
- rollback
- boot
- factory batches
- not brick
Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514