IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Heritage interpreter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Script, the group and the time.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Room, the question and the one who will not listen.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The piece, the context and not making it up.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
School group, the yard and getting them to touch carefully.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The director, capacity and not overcrowding.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they look at the stone, and not just the phone.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tour scripts
  • school groups
  • pieces
  • historical context
  • capacity
  • not make it up
  • heritage
  • guided visits

Sources for this job· O*NET 25-4012.00· ESCO/ISCO 2621

Analyse my job

Jobs with similar scores

  1. 244Environmental engineer25%
  2. 245Biomedical engineer25%
  3. 246Civil engineer25%
  4. 248Production engineer25%
  5. 249Robotics engineer25%
  6. 250Telecom engineer25%