IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Language assistant

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Sheet, the oral and the group.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the silence and the one who will not speak.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Game, the mistake and not correcting every one.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Culture, the cliché and not playing the clown.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The teacher, the hour and not leaving them copying.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they speak, and not laughing at the accent.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • orals
  • conversation sheets
  • language games
  • accent
  • culture
  • not correct every error
  • language assistant
  • groups

Sources for this job· O*NET 25-3099.00· ESCO/ISCO 2353

Analyse my job

Jobs with similar scores

  1. 245Environmental engineer25%
  2. 246Biomedical engineer25%
  3. 247Civil engineer25%
  4. 249Production engineer25%
  5. 250Robotics engineer25%
  6. 251Telecom engineer25%