Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 633
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Last-mile manager
26%
#211 / 633
View rankingLast-mile manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Zones, capacity and route cuts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
KPIs, first attempt and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
The courier, the lobby and the one who will not open.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Peaks, rain and hiring too many or too few.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The angry customer and not dressing delivered.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Cover the peak, and not leaving the neighbourhood orphaned.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- delivery zones
- first attempt
- delivery KPIs
- last-mile peaks
- lobbies
- delivery incidents
- courier capacity
- cut routes
Sources for this job· O*NET 11-3071.00· ESCO/ISCO 1324