IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Magistrate

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
File, evidence and the draft.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Hearing, the witness and the one who lies.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Deliberation, the bench and not yielding the vote.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Judgment, the ruling and not courting the headline.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The appeal, the pressure and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Decide, and signing what hurts.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • draft judgments
  • hearings
  • deliberation
  • rulings
  • appeals
  • evidence
  • the bench
  • not court the headline

Sources for this job· O*NET 23-1023.00· ESCO/ISCO 2612

Analyse my job

Jobs with similar scores

  1. 253Environmental engineer25%
  2. 254Biomedical engineer25%
  3. 255Civil engineer25%
  4. 257Production engineer25%
  5. 258Robotics engineer25%
  6. 259Telecom engineer25%