Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 633
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
NGO programme officer
26%
#213 / 633
View rankingNGO programme officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Design, indicators and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Justify, invoices and the donor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Field or neighbourhood and what does not fit the frame.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Partners, meetings and coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The surprise, the cut and redoing the timetable.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it works, and not inflating the indicator.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design projects
- justify to donors
- indicators
- activity report
- coordinate partners
- timetable
- project invoices
- neighbourhood work
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635