Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 633
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Potter
19%
#475 / 633
View rankingPotter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Clay, wheel and centring.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pull, turn and the one that collapses.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Dry, glaze and the kiln.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Order, the set and the colour that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The market, the piece and not opening too wide.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Survive the kiln, and not leaving a fat foot.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- wheel
- centre clay
- pull pieces
- glaze
- kiln
- drying
- tableware sets
- the foot
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7314