Automation index
How much of a Petroleum engineer’s job can AI already do?
A reservoir model comes earlier. Drilling without killing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Petroleum engineer
25%
AI can already do 25% of this job.
#232 / 633
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146
IS WORK OVER?
Product owner
27%
#171 / 633
View rankingProduct owner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Write stories, criteria and backlog.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 50% | +11 |
Maps, roadmaps and release notes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Refine with engineering and design.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Talk to users and stakeholders.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Prioritise, cut scope and say no.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Accept the increment and own the value.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Write stories, criteria and backlog
- Maps, roadmaps and release notes
- Refine with engineering and design
- Talk to users and stakeholders
- Prioritise, cut scope and say no
- Accept the increment and own the value
- product owner
- po agil
Sources for this job· O*NET 15-1199.09· ESCO/ISCO 2519