IS WORK OVER?

Automation index

How much of a Petroleum engineer’s job can AI already do?

A reservoir model comes earlier. Drilling without killing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Science teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Practical, the protocol and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Lab, the bunsen and the one who will not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Data, the graph and not inventing the point.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Exam, the formula and getting them to explain.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The damage, the note and not leaving the acid open.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they do not burn, and understand what they measured.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • lab practicals
  • bunsen
  • science protocols
  • graphs
  • formulae
  • acid
  • incident notes
  • lab safety

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 239Environmental engineer25%
  2. 240Biomedical engineer25%
  3. 241Civil engineer25%
  4. 243Production engineer25%
  5. 244Robotics engineer25%
  6. 245Telecom engineer25%