IS WORK OVER?

Automation index

How much of a Phlebotomist’s job can AI already do?

A queue and a label come earlier. Finding the vein and not sticking twice do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Phlebotomist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Bookings, labels and tubes.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Puncture, draw and not haemolyse.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Calm children, fear and faints.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Spin, log and send to the lab.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Waste, needlesticks and hygiene.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Not mixing up a patient or a tube.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Bookings, labels and tubes
  • Puncture, draw and not haemolyse
  • Calm children, fear and faints
  • Spin, log and send to the lab
  • Waste, needlesticks and hygiene
  • Not mixing up a patient or a tube
  • flebotomista
  • extractora
  • phlebotomist

Sources for this job· O*NET 31-9097.00· ESCO/ISCO 5329

Industrial engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model processes, balances and a first plant layout.
Estimate

No public source provides a precise figure. This is our estimate.

22%45%+9.9
Draft procedures, PFDs and operating instructions.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Analyse cost, bottlenecks and OEE from data.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Coordinate suppliers, maintenance and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Commissioning and plant trials.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Capex calls and industrial-safety liability.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Commissioning and plant trials
  • ingeniero industrial
  • industrial engineer
  • procesos industriales

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 571Ambulance driver18%
  2. 572Choreographer18%
  3. 573Beautician18%
  4. 575Florist18%
  5. 576Civil Guard officer18%
  6. 577Gas fitter18%