Automation index
How much of a Phlebotomist’s job can AI already do?
A queue and a label come earlier. Finding the vein and not sticking twice do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Phlebotomist
18%
AI can already do 18% of this job.
#684 / 753
View rankingPhlebotomist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bookings, labels and tubes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Puncture, draw and not haemolyse.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Calm children, fear and faints.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Spin, log and send to the lab.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Waste, needlesticks and hygiene.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Not mixing up a patient or a tube.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Bookings, labels and tubes
- Puncture, draw and not haemolyse
- Calm children, fear and faints
- Spin, log and send to the lab
- Waste, needlesticks and hygiene
- Not mixing up a patient or a tube
- flebotomista
- extractora
- phlebotomist
Sources for this job· O*NET 31-9097.00· ESCO/ISCO 5329
IS WORK OVER?
Welding engineer
22%
#400 / 753
View rankingWelding engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, the coupon and the qualification.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shop, the bead and the one who skips the procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the fail and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the position and the wind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the rush and not signing the extra overlap.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the bead holds, and not signing the overlap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- coupons
- welder qualification
- beads
- NDT
- positions
- overlaps
- welding procedures
Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144