Automation index
How much of a Photographer’s job can AI already do?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Photographer
28%
AI can already do 28% of this job.
#100 / 733
View rankingPhotographer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Adjust apertures, shutter speeds, and camera focus according to a combination of factors, such as lighting, field depth, subject motion, film type, and film speed.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Use traditional or digital cameras, along with a variety of equipment, such as tripods, filters, and flash attachments.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Create artificial light, using flashes and reflectors.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Manipulate and enhance scanned or digital images to create desired effects, using computers and specialized software.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Estimate or measure light levels, distances, and numbers of exposures needed, using measuring devices and formulas.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Transfer photographs to computers for editing, archiving, and electronic transmission.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Perform general office duties, such as scheduling appointments, keeping books, and ordering supplies.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Determine desired images and picture composition, selecting and adjusting subjects, equipment, and lighting to achieve desired effects.EstimateNo public source provides a precise figure. This is our estimate. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 39% | 28% | +10.9 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- interview techniques
- photography
- editorial standards
- writing techniques
- spelling
- grammar
- copyright legislation
- participate in editorial meetings
- set up photographic equipment
- study topics
Sources for this job· O*NET 27-4021.00· ESCO/ISCO 3431
IS WORK OVER?
Commissioning engineer
22%
#387 / 733
View rankingCommissioning engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Protocol, the loop and the punch.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, start-up and the one that is not ready.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Test, the trip and not jumping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Vendors, the one who does not come and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the deadline and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Start up, and not leaving the interlock jumped.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test protocols
- loops
- punch list
- start-up
- trips
- vendors
- interlocks
- not sign half done
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149