Automation index
Can AI do the work of a Photographer?
Today an AI can already spin variants and assemble a first cut. Deciding what works, what ships, and why, is still direction.
It also does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Photographer
28%
AI or a robot can already do 28% of this job.
#61 / 103
View rankingPhotographer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Adjust apertures, shutter speeds, and camera focus according to a combination of factors, such as lighting, field depth, subject motion, film type, and film speed.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Use traditional or digital cameras, along with a variety of equipment, such as tripods, filters, and flash attachments.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Create artificial light, using flashes and reflectors.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 28% | +2.2 |
Manipulate and enhance scanned or digital images to create desired effects, using computers and specialized software.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Estimate or measure light levels, distances, and numbers of exposures needed, using measuring devices and formulas.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Transfer photographs to computers for editing, archiving, and electronic transmission.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Perform general office duties, such as scheduling appointments, keeping books, and ordering supplies.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Determine desired images and picture composition, selecting and adjusting subjects, equipment, and lighting to achieve desired effects.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 39% | 28% | +10.9 |
| Total | 100% | 28% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- interview techniques
- photography
- editorial standards
- writing techniques
- spelling
- grammar
- copyright legislation
- participate in editorial meetings
- set up photographic equipment
- study topics
Sources for this job· O*NET 27-4021.00· ESCO/ISCO 3431
IS WORK OVER?
Construction laborer
29%
#45 / 103
View rankingConstruction laborer
Where the time goes
Score = Σ (weight × saving). Weight is our estimate from frequency, not a time share published by O*NET. Saving is separate.
Weights are our estimate from O*NET frequency (FT). O*NET does not publish % of the week.
| Task | Share | AI | Adds |
|---|---|---|---|
Tend pumps, compressors, or generators to provide power for tools, machinery, or equipment or to heat or move materials, such as asphalt.EstimateNo public source pins this saving. It is an estimate of the method. | 12% | 28% | +3.4 |
Dig ditches or trenches, backfill excavations, or compact and level earth to grade specifications, using picks, shovels, pneumatic tampers, or rakes.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Grind, scrape, sand, or polish surfaces, such as concrete, marble, terrazzo, or wood flooring, using abrasive tools or machines.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Signal equipment operators to facilitate alignment, movement, or adjustment of machinery, equipment, or materials.EstimateNo public source pins this saving. It is an estimate of the method. | 10% | 28% | +2.8 |
Install sewer, water, or storm drain pipes, using pipe-laying machinery or laser guidance equipment.EstimateNo public source pins this saving. It is an estimate of the method. | 9% | 28% | +2.5 |
Lubricate, clean, or repair machinery, equipment, or tools.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 12% | +1 |
Measure, mark, or record openings or distances to layout areas where construction work will be performed.EstimateNo public source pins this saving. It is an estimate of the method. | 8% | 55% | +4.4 |
Read plans, instructions, or specifications to determine work activities.EstimateNo public source pins this saving. It is an estimate of the method. | 7% | 28% | +2 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source pins this saving. It is an estimate of the method. | 26% | 28% | +7.3 |
| Total | 100% | 29% |
Modelled week 100% · Public evidence 0% · Estimate 100% · Confidence: Low
Skills this job uses
- install wood elements in structures
- apply finish to concrete
- inspect masonry work
- check compatibility of materials
- dig soil mechanically
- pour concrete
- transport construction supplies
- operate digging construction equipment
- work in a construction team
- inspect construction supplies
Sources for this job· O*NET 47-2061.00· ESCO/ISCO 9313