IS WORK OVER?

Automation index

How much of a Physicist’s job can AI already do?

A curve fit and a first paper come earlier. Designing the experiment, and believing the datum, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Physicist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Simulate, fit and reduce data.
Estimate

No public source provides a precise figure. This is our estimate.

22%50%+11
Draft papers, posters and proposals.
Estimate

No public source provides a precise figure. This is our estimate.

18%42%+7.6
Design the experiment and the apparatus.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Measure in the lab or in the field.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Argue with the group and peer-review.
Estimate

No public source provides a precise figure. This is our estimate.

14%15%+2.1
Win machine time and funding.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Simulate, fit and reduce data
  • Draft papers, posters and proposals
  • Design the experiment and the apparatus
  • Measure in the lab or in the field
  • Argue with the group and peer-review
  • Win machine time and funding
  • fisico
  • physicist

Sources for this job· O*NET 19-2012.00· ESCO/ISCO 2111

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 95Graphic designer28%
  2. 96Video editor28%
  3. 97SEM specialist28%
  4. 99Plumber28%
  5. 100Photographer28%
  6. 101Tour guide28%