Automation index
How much of a Physicist’s job can AI already do?
A curve fit and a first paper come earlier. Designing the experiment, and believing the datum, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Physicist
28%
AI can already do 28% of this job.
#98 / 623
View rankingPhysicist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Simulate, fit and reduce data.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 50% | +11 |
Draft papers, posters and proposals.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Design the experiment and the apparatus.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Measure in the lab or in the field.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Argue with the group and peer-review.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
Win machine time and funding.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Simulate, fit and reduce data
- Draft papers, posters and proposals
- Design the experiment and the apparatus
- Measure in the lab or in the field
- Argue with the group and peer-review
- Win machine time and funding
- fisico
- physicist
Sources for this job· O*NET 19-2012.00· ESCO/ISCO 2111
IS WORK OVER?
Renewables engineer
27%
#163 / 623
View rankingRenewables engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Resource, layout and the yield model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Site, topography and the cable that will not reach.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Permits, grid point and the TSO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
EPC, commissioning and export tests.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The neighbour, the council and the appeal against the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it exports, and not inflating equivalent hours.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plant layout
- solar resource
- grid connection
- commissioning
- renewables permits
- yield model
- export tests
- EPC
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149