Automation index
How much of a Piano tuner’s job can AI already do?
An octave protocol comes earlier. Leaving the piano in tune for the concert do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Piano tuner
19%
AI can already do 19% of this job.
#562 / 743
View rankingPiano tuner
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, pinblock and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Tune, octaves and the unison.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Regulate, dampers and the one that will not cut.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Voicing, hammers and the one that is hard.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The concert, the hall and not leaving it flat.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
In tune, and lasting the concert.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- tune pianos
- octaves
- unisons
- dampers
- pinblock
- voicing
- hammers
- regulate action
Sources for this job· O*NET 49-9063.00· ESCO/ISCO 7312
IS WORK OVER?
Geotechnical engineer
22%
#398 / 743
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142