IS WORK OVER?

Automation index

How much of a Piano tuner’s job can AI already do?

An octave protocol comes earlier. Leaving the piano in tune for the concert do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Piano tuner

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagnose, pinblock and the protocol.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Tune, octaves and the unison.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Regulate, dampers and the one that will not cut.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Voicing, hammers and the one that is hard.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The concert, the hall and not leaving it flat.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
In tune, and lasting the concert.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tune pianos
  • octaves
  • unisons
  • dampers
  • pinblock
  • voicing
  • hammers
  • regulate action

Sources for this job· O*NET 49-9063.00· ESCO/ISCO 7312

Surveyor

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Process stations, GNSS and drawings.
Estimate

No public source provides a precise figure. This is our estimate.

20%45%+9
Reports, volumes and deliverables.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Measure in the field, stake and set out.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Coordinate with works and the site authority.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Read the ground when the model lies.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Owning a 3 cm error.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Process stations, GNSS and drawings
  • Reports, volumes and deliverables
  • Measure in the field, stake and set out
  • Read the ground when the model lies
  • Owning a 3 cm error
  • topografo
  • surveyor
  • aparejador topografia

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Analyse my job

Jobs with similar scores

  1. 480Radiographer20%
  2. 481Family support worker20%
  3. 482Acupuncturist19%
  4. 484Potter19%
  5. 485Wall tiler19%
  6. 486Arborist19%