Automation index
How much of a Piling operator’s job can AI already do?
A pile plan comes earlier. Driving to level without cracking the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Piling operator
19%
AI can already do 19% of this job.
#521 / 633
View rankingPiling operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and each pile’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, bore and refusal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cage, pour and the tube that rides up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vibration, the neighbour and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Plant, access and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
To level, and not cracking party walls.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive piles
- bore
- cages
- refusal level
- site vibration
- pour piles
- piling set-out
- recoverable tubes
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114
IS WORK OVER?
Electronics engineer
25%
#237 / 633
View rankingElectronics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematic, simulation and PCB layout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Firmware, tests and bench.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Vendors, prototypes and certifications.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Debug EMC and field faults.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versioning and quality.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not sending a blind board to manufacture.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematic, simulation and PCB layout
- Firmware, tests and bench
- Vendors, prototypes and certifications
- Debug EMC and field faults
- Documentation, versioning and quality
- Not sending a blind board to manufacture
- ingeniero electronico
- electronics engineer
Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152