IS WORK OVER?

Automation index

How much of a Piling operator’s job can AI already do?

A pile plan comes earlier. Driving to level without cracking the neighbour do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Microbiologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Protocols, plates and a first result.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plate, incubate and read cultures.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Report to the clinician and not jump.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quality, strains and documentation.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Biosafety, waste and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not calling a negative that is a positive.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Protocols, plates and a first result
  • Plate, incubate and read cultures
  • Report to the clinician and not jump
  • Quality, strains and documentation
  • Biosafety, waste and kit
  • Not calling a negative that is a positive
  • microbiologo

Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 528Demolition worker19%
  2. 529Wastewater-plant operator19%
  3. 530Concrete finisher19%
  4. 532Recycling-plant operator19%
  5. 533Organ builder19%
  6. 534Palaeontologist19%