Automation index
How much of a Piling operator’s job can AI already do?
A pile plan comes earlier. Driving to level without cracking the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Piling operator
19%
AI can already do 19% of this job.
#531 / 643
View rankingPiling operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, level and each pile’s log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive, bore and refusal.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Cage, pour and the tube that rides up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vibration, the neighbour and stopping in time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Plant, access and the one that will not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
To level, and not cracking party walls.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive piles
- bore
- cages
- refusal level
- site vibration
- pour piles
- piling set-out
- recoverable tubes
Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114
IS WORK OVER?
Roofer
16%
#623 / 643
View rankingRoofer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, order material and set out slopes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Tile, waterproof and finish ridges.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Heights, anchors and weather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, client and not cracking tiles.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, quantities and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a leak the first winter.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Measure, order material and set out slopes
- Tile, waterproof and finish ridges
- Heights, anchors and weather
- Site, client and not cracking tiles
- Logs, quantities and extras
- Not leaving a leak the first winter
- techador
- cubiertas
- roofer
Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7111