IS WORK OVER?

Automation index

How much of a Piling operator’s job can AI already do?

A pile plan comes earlier. Driving to level without cracking the neighbour do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Tram driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, log and the cab.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stops and the pedestrian who steps out.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Badly parked car, calls and Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetable, reliefs and rush hour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The tourist, the bike and not over-hooting.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Hit nobody, and make the terminus.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive trams
  • urban stops
  • pedestrians
  • badly parked cars
  • Control
  • rush hour
  • cab checks
  • terminus

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 528Demolition worker19%
  2. 529Wastewater-plant operator19%
  3. 530Concrete finisher19%
  4. 532Recycling-plant operator19%
  5. 533Organ builder19%
  6. 534Palaeontologist19%