IS WORK OVER?

Automation index

How much of a Pizza maker’s job can AI already do?

A dough recipe comes earlier. Opening, baking and pulling it in time do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Pizza maker

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Dough, ferment and the day’s point.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Open, top and the oven at a thousand.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Serve, delivery and the one that arrives cold.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
List, costs and the topping that runs out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Saturday, the queue and not working too far ahead.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Pull it in time, and not leaving it carbonised.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • open dough
  • bake pizza
  • ferment
  • top pizzas
  • the oven
  • pizza delivery
  • dough point
  • Saturday queue

Sources for this job· O*NET 35-2011.00· ESCO/ISCO 5120

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 460Osteopath20%
  2. 461Skipper20%
  3. 462Perfusionist20%
  4. 464Politician20%
  5. 465Harbour pilot20%
  6. 466Chiropractor20%