Automation index
How much of a Pizza maker’s job can AI already do?
A dough recipe comes earlier. Opening, baking and pulling it in time do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Pizza maker
20%
AI can already do 20% of this job.
#551 / 743
View rankingPizza maker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Dough, ferment and the day’s point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Open, top and the oven at a thousand.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Serve, delivery and the one that arrives cold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
List, costs and the topping that runs out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Saturday, the queue and not working too far ahead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Pull it in time, and not leaving it carbonised.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- open dough
- bake pizza
- ferment
- top pizzas
- the oven
- pizza delivery
- dough point
- Saturday queue
Sources for this job· O*NET 35-2011.00· ESCO/ISCO 5120
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142