Automation index
How much of a Plasterboard fitter’s job can AI already do?
A setting-out comes earlier. Partition plumb and not hearing the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plasterboard fitter
19%
AI can already do 19% of this job.
#514 / 633
View rankingPlasterboard fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, tracks and the board cut list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Studs, boards and the screw to the noggin.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Insulation, joints and hearing the neighbour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Jointing, corners and the painter behind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Services, pipe runs and not chopping extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plumb, and not leaving the joint proud.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit plasterboard
- set out partitions
- tracks
- jointing
- acoustic insulation
- boards
- corners
- service runs
Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142