Automation index
How much of a Plasterboard fitter’s job can AI already do?
A setting-out comes earlier. Partition plumb and not hearing the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plasterboard fitter
19%
AI can already do 19% of this job.
#524 / 643
View rankingPlasterboard fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, tracks and the board cut list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Studs, boards and the screw to the noggin.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Insulation, joints and hearing the neighbour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Jointing, corners and the painter behind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Services, pipe runs and not chopping extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plumb, and not leaving the joint proud.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit plasterboard
- set out partitions
- tracks
- jointing
- acoustic insulation
- boards
- corners
- service runs
Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123
IS WORK OVER?
Petroleum engineer
25%
#237 / 643
View rankingPetroleum engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Reservoir, rate and the well programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Rig, mud and lost circulation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Completion, tests and the ops report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Production, water cut and the workover.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
HSE, blowout and the drill that is not a game.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not killing the well, and signing the programme.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model reservoirs
- well programmes
- drilling mud
- completion
- workover
- water cut
- well HSE
- production tests
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146