IS WORK OVER?

Automation index

How much of a Plasterboard fitter’s job can AI already do?

A setting-out comes earlier. Partition plumb and not hearing the neighbour do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plasterboard fitter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, tracks and the board cut list.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Studs, boards and the screw to the noggin.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Insulation, joints and hearing the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Jointing, corners and the painter behind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Services, pipe runs and not chopping extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Plumb, and not leaving the joint proud.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit plasterboard
  • set out partitions
  • tracks
  • jointing
  • acoustic insulation
  • boards
  • corners
  • service runs

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 521Camp counsellor19%
  2. 522Ski instructor19%
  3. 523Furniture assembler19%
  4. 525Mosaicist19%
  5. 526Neurosurgeon19%
  6. 527Power-plant operator19%