IS WORK OVER?

Automation index

How much of a Plasterboard fitter’s job can AI already do?

A setting-out comes earlier. Partition plumb and not hearing the neighbour do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plasterboard fitter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, tracks and the board cut list.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Studs, boards and the screw to the noggin.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Insulation, joints and hearing the neighbour.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Jointing, corners and the painter behind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Services, pipe runs and not chopping extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Plumb, and not leaving the joint proud.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fit plasterboard
  • set out partitions
  • tracks
  • jointing
  • acoustic insulation
  • boards
  • corners
  • service runs

Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123

Piling operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Set-out, level and each pile’s log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, bore and refusal.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Cage, pour and the tube that rides up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vibration, the neighbour and stopping in time.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Plant, access and the one that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
To level, and not cracking party walls.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive piles
  • bore
  • cages
  • refusal level
  • site vibration
  • pour piles
  • piling set-out
  • recoverable tubes

Sources for this job· O*NET 47-2073.00· ESCO/ISCO 7114

Analyse my job

Jobs with similar scores

  1. 511Camp counsellor19%
  2. 512Ski instructor19%
  3. 513Furniture assembler19%
  4. 515Mosaicist19%
  5. 516Neurosurgeon19%
  6. 517Power-plant operator19%