Automation index
How much of a Plasterboard fitter’s job can AI already do?
A setting-out comes earlier. Partition plumb and not hearing the neighbour do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plasterboard fitter
19%
AI can already do 19% of this job.
#612 / 743
View rankingPlasterboard fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, tracks and the board cut list.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Studs, boards and the screw to the noggin.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Insulation, joints and hearing the neighbour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Jointing, corners and the painter behind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Services, pipe runs and not chopping extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Plumb, and not leaving the joint proud.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fit plasterboard
- set out partitions
- tracks
- jointing
- acoustic insulation
- boards
- corners
- service runs
Sources for this job· O*NET 47-2081.00· ESCO/ISCO 7123
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142