IS WORK OVER?

Automation index

How much of a Plasterer’s job can AI already do?

A measure and an order come earlier. A wall that is true and does not crack does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plasterer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Lay on, float and reinforce corners.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Scaffolds, heights and protection.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, tradesman and job deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a ceiling that falls.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Measure, order material and set out
  • Lay on, float and reinforce corners
  • Scaffolds, heights and protection
  • Site, tradesman and job deadlines
  • Logs, quantities and extras
  • Not leaving a ceiling that falls
  • yesero

Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 723Roofer16%
  2. 724Flight attendant16%
  3. 725Security guard16%
  4. 727Mason15%
  5. 728Referee15%
  6. 729Locksmith15%