IS WORK OVER?

Automation index

How much of a Plasterer’s job can AI already do?

A measure and an order come earlier. A wall that is true and does not crack does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plasterer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Lay on, float and reinforce corners.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Scaffolds, heights and protection.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, tradesman and job deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a ceiling that falls.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Measure, order material and set out
  • Lay on, float and reinforce corners
  • Scaffolds, heights and protection
  • Site, tradesman and job deadlines
  • Logs, quantities and extras
  • Not leaving a ceiling that falls
  • yesero

Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 613Roofer16%
  2. 614Flight attendant16%
  3. 615Security guard16%
  4. 617Mason15%
  5. 618Referee15%
  6. 619Locksmith15%