Automation index
How much of a Plasterer’s job can AI already do?
A measure and an order come earlier. A wall that is true and does not crack does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plasterer
16%
AI can already do 16% of this job.
#626 / 643
View rankingPlasterer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Measure, order material and set out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Lay on, float and reinforce corners.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Scaffolds, heights and protection.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site, tradesman and job deadlines.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Logs, quantities and extras.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Not leaving a ceiling that falls.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 16% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Measure, order material and set out
- Lay on, float and reinforce corners
- Scaffolds, heights and protection
- Site, tradesman and job deadlines
- Logs, quantities and extras
- Not leaving a ceiling that falls
- yesero
Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123
IS WORK OVER?
Port crane operator
18%
#582 / 643
View rankingPort crane operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Stowage, bays and the twistlock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hoist, the wind and the spreader.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Shift, the ship that arrives and the one that leaves.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Breakdown, the spreader that will not lock and stopping.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The docker below and covering nobody.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Not hitting the ship, and leaving the bay clear.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- stowage
- twistlocks
- spreader
- bays
- lift boxes
- quay wind
- terminal shifts
- cover nobody
Sources for this job· O*NET 53-7021.00· ESCO/ISCO 8343