IS WORK OVER?

Automation index

How much of a Plasterer’s job can AI already do?

A measure and an order come earlier. A wall that is true and does not crack does not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plasterer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, order material and set out.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Lay on, float and reinforce corners.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Scaffolds, heights and protection.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, tradesman and job deadlines.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a ceiling that falls.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • build walls
  • plaster
  • site work
  • Measure, order material and set out
  • Lay on, float and reinforce corners
  • Scaffolds, heights and protection
  • Site, tradesman and job deadlines
  • Logs, quantities and extras
  • Not leaving a ceiling that falls
  • yesero

Sources for this job· O*NET 47-2161.00· ESCO/ISCO 7123

Prompt engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Design prompts, tools and chains.
Estimate

No public source provides a precise figure. This is our estimate.

24%58%+13.9
Evals, datasets and regressions.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Integrate with product and safety limits.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Talk to the business about a good output.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Watch hallucinations, bias and cost.
Estimate

No public source provides a precise figure. This is our estimate.

14%20%+2.8
Decide what the model gets, and what it does not.
Estimate

No public source provides a precise figure. This is our estimate.

12%16%+1.9
Total100%34%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Design prompts, tools and chains
  • Evals, datasets and regressions
  • Integrate with product and safety limits
  • Talk to the business about a good output
  • Watch hallucinations, bias and cost
  • prompt engineer
  • ingeniero de prompts
  • llm engineer

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2512

Analyse my job

Jobs with similar scores

  1. 623Roofer16%
  2. 624Flight attendant16%
  3. 625Security guard16%
  4. 627Mason15%
  5. 628Referee15%
  6. 629Locksmith15%