Automation index
How much of a Plastic surgeon’s job can AI already do?
A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plastic surgeon
20%
AI can already do 20% of this job.
#538 / 753
View rankingPlastic surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, photos and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Operate: flaps, implants and burns.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Pre-op, markings and what you can actually promise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Post-op, dressings and reviewing the result.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Emergencies: hand, face and the lip that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Aesthetics, reconstruction and signing what is cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plastic surgery
- flaps
- implants
- burns
- hand surgery
- pre-op marking
- post-op dressings
- reconstruction
Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212
IS WORK OVER?
Aerospace technician
19%
#647 / 753
View rankingAerospace technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Bench, the protocol and the torque.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Part, the lockwire and the one left loose.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
NDT, the crack and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Engine, the run and the one that does not fit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The engineer, the rush and not signing half done.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Torque it, and not leaving the lockwire loose.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- test bench
- torque
- lockwire
- aerospace NDT
- engine runs
- protocols
- cracks
- not sign half done
Sources for this job· O*NET 17-3021.00· ESCO/ISCO 3115