Automation index
How much of a Plastic surgeon’s job can AI already do?
A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plastic surgeon
20%
AI can already do 20% of this job.
#522 / 733
View rankingPlastic surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, photos and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Operate: flaps, implants and burns.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Pre-op, markings and what you can actually promise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Post-op, dressings and reviewing the result.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Emergencies: hand, face and the lip that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Aesthetics, reconstruction and signing what is cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plastic surgery
- flaps
- implants
- burns
- hand surgery
- pre-op marking
- post-op dressings
- reconstruction
Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142