Automation index
How much of a Plastic surgeon’s job can AI already do?
A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plastic surgeon
20%
AI can already do 20% of this job.
#531 / 743
View rankingPlastic surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, photos and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Operate: flaps, implants and burns.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Pre-op, markings and what you can actually promise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Post-op, dressings and reviewing the result.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Emergencies: hand, face and the lip that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Aesthetics, reconstruction and signing what is cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plastic surgery
- flaps
- implants
- burns
- hand surgery
- pre-op marking
- post-op dressings
- reconstruction
Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212
IS WORK OVER?
Corrosion engineer
22%
#387 / 743
View rankingCorrosion engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Thicknesses, the map and the coupon.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Plant, the pipe and the one that is thin.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Cathode, the protection and the one that will not take.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Shutdown, the coating and not painting over rust.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Operations, the rush and not leaving the thin one in service.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Stop before it goes, and not painting over it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- thicknesses
- corrosion maps
- cathodic protection
- coatings
- thin pipes
- shutdowns
- rust
- coupons
Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145