IS WORK OVER?

Automation index

How much of a Plastic surgeon’s job can AI already do?

A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plastic surgeon

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, photos and informed consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Operate: flaps, implants and burns.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Pre-op, markings and what you can actually promise.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Post-op, dressings and reviewing the result.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Emergencies: hand, face and the lip that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Aesthetics, reconstruction and signing what is cut.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plastic surgery
  • flaps
  • implants
  • burns
  • hand surgery
  • pre-op marking
  • post-op dressings
  • reconstruction

Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212

Electronics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schematic, simulation and PCB layout.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Firmware, tests and bench.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Vendors, prototypes and certifications.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Debug EMC and field faults.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versioning and quality.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not sending a blind board to manufacture.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schematic, simulation and PCB layout
  • Firmware, tests and bench
  • Vendors, prototypes and certifications
  • Debug EMC and field faults
  • Documentation, versioning and quality
  • Not sending a blind board to manufacture
  • ingeniero electronico
  • electronics engineer

Sources for this job· O*NET 17-2072.00· ESCO/ISCO 2152

Analyse my job

Jobs with similar scores

  1. 440Orthopaedic surgeon21%
  2. 441Urologist21%
  3. 442Teaching assistant20%
  4. 444Tow-truck driver20%
  5. 445Private-hire driver20%
  6. 446Dietitian20%