Automation index
How much of a Plastic surgeon’s job can AI already do?
A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Plastic surgeon
20%
AI can already do 20% of this job.
#522 / 733
View rankingPlastic surgeon
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plan, photos and informed consent.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Operate: flaps, implants and burns.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Pre-op, markings and what you can actually promise.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Post-op, dressings and reviewing the result.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Emergencies: hand, face and the lip that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Aesthetics, reconstruction and signing what is cut.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plastic surgery
- flaps
- implants
- burns
- hand surgery
- pre-op marking
- post-op dressings
- reconstruction
Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212
IS WORK OVER?
Geotechnical engineer
22%
#391 / 733
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142