IS WORK OVER?

Automation index

How much of a Plastic surgeon’s job can AI already do?

A morph and a consent form come earlier. Cutting, stitching and not getting necrosis do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Plastic surgeon

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, photos and informed consent.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Operate: flaps, implants and burns.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Pre-op, markings and what you can actually promise.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Post-op, dressings and reviewing the result.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Emergencies: hand, face and the lip that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Aesthetics, reconstruction and signing what is cut.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • plastic surgery
  • flaps
  • implants
  • burns
  • hand surgery
  • pre-op marking
  • post-op dressings
  • reconstruction

Sources for this job· O*NET 29-1242.00· ESCO/ISCO 2212

Tunnel engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Heading, the geology and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Water, the inflow and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Blast, the vibration and the building.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Segment, the ring and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not come down, and not hiding the water.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • tunnel headings
  • support
  • inflows
  • blasts
  • segments
  • tunnel geology
  • rings
  • vibrations

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 545Orthopaedic surgeon21%
  2. 546Urologist21%
  3. 547Teaching assistant20%
  4. 549Tow-truck driver20%
  5. 550Private-hire driver20%
  6. 551Dietitian20%